top of page
Devils Lake Public School Logo.png

DEVILS LAKE PUBLIC SCHOOL
FACILITY ASSESSMENT

Arrow Down

RECENT DOCUMENTS

documents files.png

Project Documents

Facility Assessment Report

write-593333_1920.jpg

Meeting Minutes

Coming Soon

vote.jpg

Bond Notice and Ballot Information

Coming Soon

Info

ABOUT THE PROJECT

This document reviews the current conditions of all facilities within Devils Lake Public Schools, as well as case studies to consider for the resolution of facility issues. This is not intended to represent a design solution, but rather demonstrate the facts observe through our study. ICON Architectural Group (ICON) teamed up with Prairie Engineering, Lowry Engineering, and CMAR to prepare the information included within this report. The facility assessment was commissioned to assist the District with long-range planning and to address increasing enrollment, changing educational requirements, and aging facilities. This assessment includes input from architects, engineers, educational planners, and Devils Lake Public Schools staff.


The scope of this report is to identify deficiencies within the current facilities including code compliance, Americans with Disabilities Act (ADA) compliance, security, and educational adequacy. The report will apply all costs associated with the upgrades required and deferred maintenance items identified within Minnie H., Prairie View, and Sweetwater Elementary Schools, Central Middle School, LACTC, Sports Center, Devils Lake High School, and the Bus Storage and Maintenance Building. Options to consider include renovating the current facilities to meet long-range needs and/or new construction. 

bottom of page